The same photograph can be a USD 5.20 scooter or a USD 14.80 scooter. The difference is not honesty — it is six components and one carton. Here is the whole cost structure, so you can price a range instead of arguing about a number.
Every quotation we issue is built from the same six blocks. When a buyer sends a competitor's price and asks us to match it, this is the table we fill in together.
| Block | Range inside the block | USD per piece | What the difference actually buys |
|---|---|---|---|
| Frame and stem | Steel 1.2 mm to aluminium 1.5 mm | 1.40 - 2.60 | Aluminium will not rust in coastal markets; steel paint quality decides year-two survival |
| Deck | PP to ABS to steel with grip tape | 0.35 - 0.95 | Thin PP flexes and cracks at the front edge under a jumping child |
| Wheels | PU 120 mm plain to 140 mm light-up | 0.55 - 1.60 | Magnetic induction needs no battery and cannot be returned as flat |
| Bearings | Bushing to ABEC-7 | 0.08 - 0.45 | The single most common cause of 'it doesn't roll properly' complaints |
| Folding joint | Fixed to foldable with locking collar | 0.10 - 0.70 | Foldable saves freight space and adds the main failure point |
| Packing | Poly bag to printed colour box with insert | 0.30 - 1.20 | Also changes CBM, so it moves the freight line too |
Add electronics if the model has them — a music and lights board in the stem is roughly USD 0.50-1.10 and adds one more thing that can fail in the field.
| Band | FOB USD / pc | What is typically inside | Where it sells |
|---|---|---|---|
| Entry | 5.00 - 7.50 | Steel frame, plain PU wheels, bushing or carbon bearings, fixed or simple fold, poly bag or basic box | Open markets, wholesale channels, promotional volume where the box is not the selling tool |
| Main range | 8.00 - 11.50 | Steel or aluminium stem, 1.5 mm joint, induction light-up wheels, printed colour box, foldable | Supermarkets, toy chains, e-commerce private label — the volume zone in most of Asia, Africa and Latin America |
| Premium | 12.50 - 18.00 | Full aluminium, ABEC-7, wider deck, music board, deluxe box with insert, tested to a named standard | EU and US retail, brand programmes, gift season |
Where our own range sits: the twenty-four shells on the models page are built on one platform — steel or aluminium stem, 50 kg load, 120-140 mm wheels — and land in the main range. We quote entry or premium when a buyer needs it, but we do not pretend a USD 5 scooter is a USD 12 scooter with a different sticker.
Sometimes it is a real product for a real market. Sometimes something has been removed. In order of how often we see it:
None of these are visible in a sample that the factory prepared for you. Ask for a production sample pulled from a live order, and state that the bulk must match it.
At 0.141 CBM and 10 pieces per carton a 40HQ takes 4,600 pieces. Change the carton to 0.160 CBM and it takes about 4,060 — nearly 12% more freight on every piece. If ocean freight is USD 2,800 for the container, that is roughly USD 0.07 per piece at 4,600 and USD 0.09 at 4,060. On a USD 9.00 scooter that is a 0.8% swing, which is small.
Now do the same arithmetic on a 500 piece trial order in LCL. Freight becomes USD 0.85-1.45 per piece instead of USD 0.07. Suddenly the carton is more important than the frame material. This is why we ask buyers for quantity before we discuss price — the correct answer changes with it.
| Quantity | What unlocks | Effect on price |
|---|---|---|
| 50 - 199 pcs | Stock colours, stock cartons, our logo or blank | Price list |
| 200 - 499 pcs | Stock colours, printed colour box, buyer logo | 2-4% below list |
| 500 - 1,299 pcs | Custom colour way, custom box, mixed models allowed | 4-7% below list |
| 1,300+ pcs | Container programme, scheduled releases, dedicated production slot | Quoted per programme |
The ladder exists because of setup, not because of haggling. Screen printing a logo has a setup cost that has to be spread; a a custom colour box has a plate charge and a minimum print run. Asking for the 1,300 piece price at 120 pieces is asking the supplier to absorb setup — which they will do either by refusing, or by quietly reducing something else.
Numbers make the argument better than adjectives. Here is a 40HQ of 4,600 pieces at USD 9.00 FOB, shipped to a market with a 10% duty rate.
| Line | Basis | USD | Share of FOB |
|---|---|---|---|
| Goods, FOB Tianjin | 4,600 x USD 9.00 | 41,400 | 100.0% |
| Ocean freight, 40HQ | Tianjin to Nhava Sheva | 2,800 | 6.8% |
| Insurance | 0.3% of CIF | 132 | 0.3% |
| Duty | 10% of CIF value | 4,433 | 10.7% |
| Destination charges | THC, CFS, documentation | 400 | 1.0% |
| Landed, total | 49,165 | 118.8% | |
| Landed, per piece | 10.69 | USD 1.69 over FOB |
So a USD 9.00 scooter costs USD 10.69 in your warehouse before you touch it. If your retail channel wants a 45% margin on a USD 24.99 shelf price, that leaves USD 13.74 of wholesale revenue and USD 3.05 of gross margin per piece before inland delivery and returns. Change the duty rate to 20% and most of that margin disappears — which is why the HS code question in our import guide matters more than a 2% discount.
Before you study a price, run four numbers against it. They catch the majority of quotes that cannot be real.
| Ratio | How to compute | Healthy range | What a miss tells you |
|---|---|---|---|
| CBM per piece | Carton CBM divided by pieces per carton | 0.012 - 0.020 for a 120-140 mm scooter | Above 0.025 means you are shipping air |
| Gross weight per carton | Weigh it, or ask | 19 - 24 kg for 10 pcs | Below 17 kg usually means thinner steel |
| Price per kilo | FOB price divided by net weight | USD 0.40 - 0.75 per kg of finished scooter | Very low means the weight is not in the product |
| Implicit freight per piece | CBM per piece x freight rate | USD 0.06 - 0.10 in a 40HQ | Compare this instead of the unit price |
None of these prove quality. They prove physics: a scooter of a given size and weight cannot be made for a price that ignores the steel in it. When a quote beats the range by 30%, something in the table is being paid for by you later.
Send the model or a photo, the quantity, the destination port, and your target retail price. A supplier who knows your retail price can tell you within one exchange whether the target is reachable — and if the answer is no, you have saved three weeks. That conversation is the whole job; everything else is paperwork.
Straight answers to what buyers ask before the first order.
Entry models sit around USD 5.00-7.50, the main volume range at USD 8.00-11.50, and premium aluminium models with lights and music at USD 12.50-18.00. The price is set by frame material, tube wall, wheels, bearings and packing, not by the shell design.
Usually because something was removed: thinner tube wall, bushings instead of bearings, single-wall carton, shortened paint system, fewer screws — or a specification they cannot evidence when you ask to see the production line. Ask for a production sample pulled from a live order, not a prepared sample.
Yes, but the saving comes from setup costs — logo screen, colour box plates, colour-way minimums — not from the supplier's margin. Our ladder runs from list price at 50-199 pieces to 4-7% below list at 500-1,299 pieces.
About USD 0.07 per piece in a full 40HQ at 4,600 pieces, versus USD 0.85-1.45 per piece on a 500 piece LCL trial order. That is why the same scooter has a different landed cost depending on how much you buy.
No. For an open market where the box is not the selling tool, an entry model is the correct product. It becomes a problem when a buyer pays entry cost and expects premium durability — that mismatch produces the returns, not the price.
Often, but we will tell you what changed to get there. We quote against a written specification, so the comparison is line by line: tube wall, bearings, wheel type, packing. If the number only works with a thinner joint, you should know that before you order.
Three models, one order size, and the three numbers that shift landed cost: carton volume (0.139 vs 0.141 CBM), gross weight (20 vs 23 kg) and pieces per 40HQ.
Send the models and quantity you have in mind. You get carton size, CBM, gross weight and FOB Tianjin price in writing, usually within one working day.